Factory making Best Electric Water Pump - GKX High-Pressure Self-Priming Pump – GOOKING

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our pros are lessen prices,dynamic sales team,specialised QC,sturdy factories,top quality services and products for Ro Booster Pump High Flow , Ro Booster Water Pump , Garden Pump , With the eternal goal of "continuous quality improvement, customer satisfaction", we are sure that our product quality is stable and reliable and our products are best-selling at home and abroad.
Factory making Best Electric Water Pump - GKX High-Pressure Self-Priming Pump – GOOKING Detail:

MODEL Power
(W)
Voltage
(V/HZ)
Current
(A)
Max.flow
(L/min)
Max.head
(m)
Rated flow
(L/min)
Rated head
(m)
Suction head
(m)
Pipe size
(mm)
GKX200A 200 220/50 2 33 25 17 12 8 25
GKX300A 300 220/50 2.5 33 30 17 13.5 8 25
GKX400A 400 220/50 2.7 33 35 17 15 8 25
GKX600A 600 220/50 4.2 50 40 25 22 8 25
GKX800A 800 220/50 5.2 50 45 25 28 8 25
GKX1100A 1100 220/50 8 100 50 42 30 8 40
GKX1500A 1500 220/50 10 108 55 50 35 8 40

GKX series of pumps have automatic function, that is, when the tap is turned on, the pump will start automatically; when the tap is turned off, the pump will stop automatically. If it is used with the water tower, the upper limit switch can automatically work or stop with the water level in the water tower. GKX is with streamline product design, novel and generous, in line with the use of various occasions.

Features:

GKX-8

1.New flow channel structure;
2.Low noise;
3.Reduce the pump temperature rise;
4.New design of pump control circuit board;
5.Improved stability;
6.User-friendly

Description of indicator light:

1. Water flow indicator: on: water flow detected, off: no water flow detected
2. Pressure indicator: on: no pressure detected, off: pressure detected
3. Power indicator: flashing: in forced shutdown state, normally on: in normal state
4. Water shortage indicator: flashing: water shortage, off: no water shortage
5. Induction indicator: on: water flow switch fault off: normal state
6. Card indicator: on: rust removal, off: normal state, flashing: forced start / close
7. Timing indicator: set timing time

GKX-6

Using instructions:
1. After power on, delay 3 seconds, start the motor for 6 seconds, and enter the dual control operation mode
2. In the dual control mode, press the timing button for 5S to enter the timing mode, and the timing indicator light is on to indicate the timing time.
3. In the timing mode, press the timing button briefly to switch the timing time.
4. In the timing mode, press the automatic switch button for 5S to re-enter the dual control operation mode.
5.In the timing mode / dual control mode, press the automatic switch button and click start or stop.


Product detail pictures:

Factory making Best Electric Water Pump - GKX High-Pressure Self-Priming Pump – GOOKING detail pictures

Factory making Best Electric Water Pump - GKX High-Pressure Self-Priming Pump – GOOKING detail pictures

Factory making Best Electric Water Pump - GKX High-Pressure Self-Priming Pump – GOOKING detail pictures

Factory making Best Electric Water Pump - GKX High-Pressure Self-Priming Pump – GOOKING detail pictures

Factory making Best Electric Water Pump - GKX High-Pressure Self-Priming Pump – GOOKING detail pictures

Factory making Best Electric Water Pump - GKX High-Pressure Self-Priming Pump – GOOKING detail pictures

Factory making Best Electric Water Pump - GKX High-Pressure Self-Priming Pump – GOOKING detail pictures

Factory making Best Electric Water Pump - GKX High-Pressure Self-Priming Pump – GOOKING detail pictures

Factory making Best Electric Water Pump - GKX High-Pressure Self-Priming Pump – GOOKING detail pictures

Factory making Best Electric Water Pump - GKX High-Pressure Self-Priming Pump – GOOKING detail pictures


Related Product Guide:

Every member from our high efficiency sales team values customers' needs and business communication for Factory making Best Electric Water Pump - GKX High-Pressure Self-Priming Pump – GOOKING , The product will supply to all over the world, such as: Afghanistan, Ghana, San Francisco, To work with an excellent products manufacturer, our company is your best choice. Warmly welcome you and opening up the boundaries of communication. We are the ideal partner of your business development and look forward to your sincere cooperation.
  • We are really happy to find such a manufacturer that ensuring product quality at the same time the price is very cheap.
    5 Stars By Anna from Luxemburg - 2018.12.30 10:21
    The company has a good reputation in this industry, and finally it tured out that choose them is a good choice.
    5 Stars By Betsy from Ghana - 2018.12.11 11:26
    Write your message here and send it to us